I'll provide a quick update as Sooty was taking time off for good behaviour yesterday......
No 3 engine is now fully installed and ready for dry/wet cycles next Saturday. We pressure tested the fuel line into the engine yesterday with no problems. We have yet to wirelock the three hydraulic Avery couplings until we check them for leaks under some 'proper' engine-driven hydraulic pump pressure next Saturday.
We also took the opportunity yesterday to leak test the port side de-fuel/AAR pipe coupling that we repaired a few weeks ago - again no problems - not that we're planning to do any AAR but we do rely on this pipe when fuel is being moved across the aircraft during ground refuelling.
Another fuel related problem was signed off yesterday - the AAPP (Rover) 10 gallon fuel tank had previously overfilled when the float valve didn't shut - we have been unable to replicate this problem since despite several tests, so we reinstated the pipework at the top of the tank ready for 26th March.
Mark checked the P1 and P2 foot brake motor hydraulic levels - they notoriously seep and need refilling.
We also unveiled the modification to the castoring end of the towing arm - sorry I don't have any photographs - but it works better now than at any time since it was designed!
Next Saturday - fit the repaired starboard side defuel valve armature (fabricated by Eric at home over the winter) and test. We have a suspected problem on the No 2 main 115V transformer phase detection unit - but we have a plan to sort that as well. Then under Mark's supervision we'll take delivery of 1,500 litres of fuel. Then dry/wet cycles and we'll be ready for 26th and EGR on all 4 engines followed by lending the aeroplane to the '558 aircrew for a good shakedown!
Keeps us off the streets, and out of the shops......bliss